The first day of dishes

by DQ on September 4, 2010

This was a comparatively easy day, we met at the Tamworth Congregational Church, to hang the Nanobridge dish on the back, and plan our installation of the Network Operating Center (NOC). A new phone line will need to be installed, it will be accessed from the choir loft. Shielded network cable will need to be run from the router in the loft, up through the attic space to the dish on the back of the building. As soon as Fairpoint is able to get the phone line in, and NHVT gets the bandwidth flowing, we can program the router board for the church and the one on Great Hill and establish that primary link, our “backhaul”.

Leave a Comment

Previous post:

Next post: